Road Works on High Street/Leach Highway/Carrington Street

Published on Thursday, 18 February 2021 at 2:47:26 PM

Roadworks

From  7am 26 February 2021 to 5am 2 March 2021, the intersection of Carrington Street, Leach Highway and High Street will be closed to traffic travelling north and south.

• Vehicles travelling westbound on Leach Highway can turn left into Carrington Street southbound.

• Vehicles travelling Carrington St southbound will be able to turn left onto Leach Hwy

• Vehicles travelling east and west on High Street will be reduced to one lane in both directions between Wilkinson Street and 200m east of the intersection.

• Vehicles travelling High St eastbound will be able to turn left onto Carrington St northbound

Traffic management and speed reductions will be in place during the works.

Heavy Vehicles will not be detoured via Marmion Street, and are only permitted to travel via: Carrington Street (south of the High Street, Leach Highway and Carrington Street intersection), Leach Highway High Street, and Stock Road.  Speeds will be reduced to 40 km/h.

BUS STOP ID: 11148 Carrington St Northbound to be closed by PTA 7pm Friday to 5am Tuesday. 

BUS STOP ID: 10780 Carrington St Southbound to be closed by PTA 7pm Friday to 5am Tuesday. 

The Public Transport Authority will deviate buses on the above routes during the days of the roadworks.

A map of the affected streets is below.

traffic detours

Back to All News